Please be advised that the Consulting Engineers, responsible for the electrical reticulation on the R24 Road Construction have requested an outage to Normalize the feeder cables which were Abnormal during the construction of the road. The outage is requested for the 30/03/2017 and is estimated to take 7hrs from 0800H- 1500H. Affected areas will be from KFC up to the Hunters Rest hotel along the R24 Road.